Button_A91BC91A_BD21_5735_41B1_D90D46C4E224.label = Area 90: UW Supply
Button_A947E661_BD21_5D17_41C8_9F4947BAF7EB.label = Area 95: Sitewide Facilities
Button_A95E2257_BD2F_753A_41C9_5659E0DAF7F5.label = Area 01: Trailer Area
Button_AD9D58FC_BCE1_36E7_41E2_AFAE75E1BD27.label = Area 80: Odor Control & Main Substation
Button_AE5689A0_BD2E_F716_4182_695C93D72912.label = Area 20: Solids Dewatering & Cake Storage
Button_AF0199A9_BD21_376B_41D5_A7BEE053971D.label = Area 65: CHP
Button_AF150FAF_BD21_6B69_4188_1BE7C4135324.label = Area 40: Thermal Hydrolosis Process
Button_AF1C3898_BD21_D535_4187_736885A24430.label = Area 30: Cake Receiving Facility
Button_AF4EF16C_BD23_D7E9_41E7_0B120130CC32.label = Area 75: Sidestream Treatment
Button_AF6F9C96_BD27_6D38_41DA_AE00D2549807.label = Area 60: Gas Treatment & Storage
Button_B322B0EE_BCE3_56FE_41DE_83A8614C4BF4.label = Area 50: Solids Digestion
Button_B32F0CBC_F001_A8AF_41E6_BB2933EAF0B7.label = VIEW AERIAL
Button_C3EE924C_CD87_EBA7_41E6_D89DF6541771.label = SOLIDS CONSTRUCTION VIDEO
Button_D576E60E_C72A_059E_41E6_4C919429F887.label = VIEW PROCESS FLOW DIAGRAM
Button_D5E006E7_C73A_0280_41B7_89EFB92D0E7F.label = CAMBI CONSTRUCTION VIDEO
Button_E9BC1288_CC64_AC5B_41E1_A622DD9C319C.label = Area 10: Gravity Thickening
### Multiline Text
HTMLText_2CA21351_016E_527A_4153_4A0AAA5F3E24.html =
Joe Uglevich, Design Manager @ WSSC
Rob Stout, South Water Practice Leader
Scott Abrams, Design Manager @ CLTWater
Nikki Stephens, Design Engineer @ CLTWater
David Socha, Project Technical Lead @ WSSC and CLTWater
HTMLText_2CED7A59_016A_D26A_4149_373C6F41324C.html = Robert Wierzbicki, Project Director @ WSSC
Laura Simmers, Preconstruction Specialist @ WSSC
Joe DeHart, Construction Executive @ CLTWater
Ian MacDougall, Director of Preconstruction @ CLTWater
Alan Parent, Project Development Director
Ravi Bidichandani, Business Development Manager
HTMLText_338FB113_012E_6F88_416E_E2D91E5E7D24.html =
HTMLText_9EB08338_BF23_7442_41E1_450A8A4E02DB.html = WSSC Piscataway WRRF Bio-Energy Project
Accokeek, Maryland
HTMLText_A2E5AB81_BD23_EBE8_41E4_FABA6223F661.html =
HTMLText_A3A31A75_ED69_FA8F_41E0_5D3AEB8C2EBC.html = Fast Facts:
Engines and boilers procured from a single entity for maximum coordination
Grants awarded from State and electric utility for achieving 60% and 65% efficiency respectively
Boilers can be operated on biogas (run on above ground pipe racks)
HTMLText_A3AB2A79_ED69_FA87_41E5_9EDCF0CE6430.html =
HTMLText_A3AC7A76_ED69_FA8D_41E9_881182BD2F2E.html = Construction Highlights:
Area 65 Power Distribution Center (PDC) Vault
HTMLText_A3ACCA76_ED69_FA8D_41E8_3A15F6FF6D72.html = Challenges:
Team made enhancements to reach higher efficiency rates than originally planned
Engaged vendor during design for coordination assistance as CHPs are proprietary
Extensive underground
HTMLText_A3ACDA75_ED69_FA8F_41AF_0561B007884F.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_A6AFA7E1_ED58_0993_41E5_9B57C424F74C.html =
HTMLText_A6B4B7DE_ED58_09B1_41E1_DD27DCE6C658.html = Construction Highlights:
Skid-mounted systems for gas storage and cleaning
Extensive underground coordination using 3D modeling
HTMLText_A6B4C7DC_ED58_09B1_41B0_04F53CCF04CA.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_A6B4E7DD_ED58_09B3_41E0_879E216B2794.html = Challenges:
Meeting Washington Gas pipeline quality standards
Air permit limitations on annual flare usage
High reliability was key driver for this system
HTMLText_A6B717DD_ED58_09B3_41E1_BB3A41602989.html = Fast Facts:
Owner receiving RIN credits of $2+ million for rNG
Wash water technology for gas cleaning for improved reliability and lower capital and operating costs
Gas storage sphere provides 3 hours of bio-gas storage
HTMLText_B06F1F8A_EDE8_FA6D_41E0_4C1DAAD89FB5.html =
HTMLText_B5997210_EDD8_0A7E_4196_503E6749DC86.html = Area 20
Solids Dewatering and Cake Storage
HTMLText_B5C9FD1F_EDD8_1E62_41DE_548F8B8D15A0.html = Area 10
Gravity Thickening
HTMLText_B5CC2050_EDD8_06FE_41E0_5877445CFA4A.html =
HTMLText_B6D9A799_EDE8_0A6C_4194_0E3024EF8EEB.html = Area 75
Sidestream Treatment
HTMLText_B767B719_EDE8_0A6C_41E6_811A3A6A70C8.html = Area 60
Gas Treatment & Storage
HTMLText_B7D1C004_EDE8_0665_41E9_D6DCAE8FACE8.html =
HTMLText_B93AF509_EDE8_0E6E_41E1_E7C4A5B74608.html = Area 40
Thermal Hydrolosis Process
HTMLText_BA5340C3_EDE8_07E2_41E7_B763CD4A44E8.html = Area 30
Cake Receiving Facility
HTMLText_BD0F40BC_ED58_0793_41DF_1A1A3D619124.html = Click Here to see a video of the sidestream install
HTMLText_BD1070AE_ED58_078C_41D1_FFAE00B4008D.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_BD1150B7_ED58_079D_41E6_B0EAF61A2649.html = Challenges:
Vendors have limited experience globally on THP filtrate streams
Biological acclimation
Strong focus on start-up and commissioning
HTMLText_BD11C0B3_ED58_0795_41D3_BC8D4679D7E9.html = Fast Facts:
Proprietary deammonification process to handle high-strength nitrogen waste stream from post-dewatering filtrate
Dutchland precast post-tensioned concrete tankage
HTMLText_BD1290B9_ED58_0795_41A4_1AFFA8F20F70.html = Construction Highlights:
Three base slabs (each at different elevations); 89 wall panels; and 30 beam, walkway, roof and floor panels
PC self-performing Veolia installation inside the tankage
HTMLText_C20020B1_EAD8_07C4_41DF_82955FE5024B.html = Fast Facts:
Stantec's +25 Cambi designs, PC's 2nd Cambi in Metro DC (including largest in the world)
First Cambi redundant module in the world
Functions like a series of pressure vessels
HTMLText_C20060B1_EAD8_07C4_41EA_11FE70B58EE6.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_C20090B2_EAD8_07C4_41E5_6A79106315B6.html = Challenges:
Managing biosolids while Cambi undergoes routine annual maintenance and inspection
Owner-negotiated vendor subcontract assignment
Long-lead equipment from Europe during Covid-19
HTMLText_C200C0B2_EAD8_07C4_41E6_5AFC99622A31.html = Construction Highlights:
PC self-performed Cambi installation
HTMLText_C207E0B4_EAD8_07CC_41DA_73F76A9FB1DB.html = Click Here to see Cambi Building Construction Video
HTMLText_C6A9E133_F003_B99A_41D3_B6CBA0B266C9.html =
HTMLText_C6AC313B_F003_B98A_41DC_1B2E52ABEECB.html = rNG to
Washington
Gas or
CHP
HTMLText_C6AC5137_F003_B99A_41E6_88FB517B043F.html =
HTMLText_C6AC5139_F003_B996_41D6_E9D1FA189F8F.html =
HTMLText_C6AC813D_F003_B98E_41E3_4697D82D74D9.html =
HTMLText_C6ACD13C_F003_B98E_41ED_F94A8E3D9D23.html =
HTMLText_C6ACE13E_F003_B98A_41E1_AED4D35F46C2.html =
HTMLText_C6ACF13A_F003_B98A_41D3_91951D05CF1F.html =
HTMLText_C6AF1135_F003_B99E_41E9_AEFEDC8422BE.html =
HTMLText_C6AFA138_F003_B996_41D3_8E140E8B201E.html =
HTMLText_C6AFB136_F003_B99A_41D1_E15C2E908FD2.html =
HTMLText_C988040F_E637_D8FD_41C7_D5A7ABC2EB48.html = Fast Facts:
The Piscataway WRRF Bio-Energy project is a $272 million progressive design-build project
PC and Stantec are co-located at this field office
Design and preconstruction started in 2017
Phase 1 (Early Work Package) started in 2019
Phase 2 currently underway with construction complete 2023 and commissioning complete 2024
HTMLText_CC8B41FB_EB28_090D_41D7_2396EB12FA15.html = Click Here to see constructed systems!
HTMLText_CD7C61F7_EB28_0904_41D6_9E30AECFB313.html = Fast Facts:
Cake received from 4 WRRFs plus Piscataway pre-dewatered sludge cake
Two (2) cake storage bins provide enough storage for weekends and holidays
Each bin has live bottom screw conveyers and isolation slide gates
Boundary layer injection systems to assist pumping of sludge cake
Four (4) progressive cavity pumps to feed Cambi THP system
HTMLText_CD7CA1F6_EB28_0904_41E2_BEDC88B4F2A0.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_CD7CB1F8_EB28_090C_41D2_9B7B814A9B96.html = Challenges:
Most critical area for fugitive odor control
Mixing sludge cake from 5 sources to create consistent cake for Cambi THP
Incorporating future expandability
HTMLText_CD7CC1F8_EB28_090C_41C6_1732130FB24C.html = Construction Highlights:
PC self-performing process mechanical at this Area to maintain tight schedule and quality control
Equipment arrived on site October 2021
HTMLText_D4253EC4_E60F_494D_41E6_D54414C32BCB.html = Fast Facts:
Solids building is a 12,400-square-foot precast building consisting of 43 wall panels and 14 double tee roof panels
Building erected in 8 days around 7 dewatering presses and fiberglass tanks
Includes laboratory and electrical room
HTMLText_D45B9301_E67B_58C3_41C6_68E6ACC15F2D.html = Click Here to see Solids Building Construction Video
HTMLText_D5D92495_C72E_3E3E_41D1_F99F7C916377.html =
HTMLText_D6C954A5_E677_B9C2_41DC_C7FAFCD1FDAF.html = Construction Highlights:
Precast building was erected in just 8 days around the large presses! High quality and less on site labor!
HTMLText_D7A86B78_E609_4F47_415F_6D1B8E80CAF8.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_D7A8DB78_E609_4F47_41D8_764131FE9141.html = Challenges:
Used ventilation to mitigate potential aerosol contamination from pre-dewatering to post-dewatering Class A biosolids
Purpose-built facility rather than repurposing an existing incinerator building
Significant floorplan coordination to house all process equipment in a limited footprint
HTMLText_D7CC1794_C72A_3A38_41E4_46D462DED7D0.html =
HTMLText_D980C77E_E619_4730_41E4_34DE4D2653A5.html = How to Tour the Site:
Process flow is divided into areas accessed through the left pane navigation
Tour and project information is contained on the right pane navigation
-Enjoy!
HTMLText_DC9843DD_F000_D84C_41DA_4EB54CD49735.html = Click Here to see photos of Digester Control Building
HTMLText_DD22E98C_F001_A8B8_41DE_16ECDC61CE76.html = Click Here to see constructed systems!
HTMLText_DE4412A9_EAD8_0BFF_41E2_2C57D96D9770.html = Click Here to see photos of AD's
HTMLText_DE4C3290_EAD8_0BAD_41C3_E27452E83AE7.html = Process Overview:
Piscataway WRRF sludge travels through solids screens, three (3) two-meter pre-dewatering presses handle and is pumped to Area 30 Cake Receiving
Four (4) two-meter post-dewatering presses handle final dewatering creating Class A biosolids
Flexibility to convey Class A biosolids directly to trucks or to Cake Storage Pad
HTMLText_DE4C5298_EAD8_0BDD_41E7_CDCEF351AAED.html = Fast Facts:
Two (2) 1.5-million-gallon pre-stressed concrete tanks with cast-in-place concrete domes
Tanks consists of 17 individual concrete panels cast on site weighing 30+ tons each
Tanks are 50 feet tall and 78 feet in diameter
HTMLText_DE4D32A5_EAD8_0BF7_41EC_0BFBB6F9EA45.html = Construction Highlights:
Flying precast panels
Interior shoring for domes
Placing concrete for domes
HTMLText_DE4DC2A1_EAD8_0BEF_41EB_B498D5BB2A5F.html = Challenges:
Rapid volume expansion (RVE) of thermally hydrolyzed sludge is accomodated for
Managing digester gas through CHP
HTMLText_E2B677CA_CC24_9408_41D6_7D1E56C20126.html =
HTMLText_F0027214_EB68_0B4F_41E6_C261A6BAF5C3.html = Construction Highlights:
PC is self-performing the work at all gravity thickeners because of MOPO sensitive work
Constrained towards end of schedule
HTMLText_F2F4BEE4_EB68_F8C8_41D7_A4EBFECC3C94.html = Challenges:
Four-stage MOPO developed to maintain lime operations
Cannot complete this work until new facilities are operational to avoid contamination of Class A biosolids
HTMLText_F2F76EE3_EB68_F8C8_41E1_0656CBE1E7CA.html = Fast Facts:
Refurbishing three gravity thickeners and retrofitting the fourth into digested sludge storage tank
HTMLText_F9F944A0_CC64_B434_41E8_9A46DF4347FD.html =
HTMLText_FC5C8D10_CC2D_F41A_4154_2A1A6F4EDE68.html =
HTMLText_FCDB47CB_CC6C_740B_41B8_DD7B5BCBF048.html =
HTMLText_FD2C64FF_CC5D_B40A_41C0_ACBE4EFD17B7.html =
HTMLText_FD35F79A_CC6D_B415_41C8_363A6C6984FE.html =
HTMLText_FD9C30E1_CC24_6C3D_41E9_7D2AC1AA914B.html =
HTMLText_FEF673BA_CC64_EC15_41DC_4D003F195BE6.html =
HTMLText_FEFCF678_CC63_B415_41C0_E5E0989B1FFF.html = rNG to
Washington
Gas or
CHP
HTMLText_FF2392A5_CC6C_6C3F_41E2_BF38E8384112.html =
HTMLText_FF9A6A73_CC65_BC1B_41B7_46A683C989F3.html =
## Media
### Title
album_2B273DC1_013A_7668_416C_7D9C77DA82FE.label = Area 65
album_2B273DC1_013A_7668_416C_7D9C77DA82FE_0.label = AREA65_CHP 1
album_2B273DC1_013A_7668_416C_7D9C77DA82FE_1.label = AREA65_CHP 2
album_A03A5168_ED58_0692_41E8_2C69EFB3C659.label = Area 50 Digester Domes 2
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_0.label = Area 50 Digester Domes 2
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_1.label = Area 50 Digester Domes
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_2.label = Area 50 Digesters Partially Complete
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_3.label = Area 50 Flying Digester Panels
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_4.label = Area 50 Internal Shoring 2
album_A03A5168_ED58_0692_41E8_2C69EFB3C659_5.label = Area 50 Internal Shoring
album_A27E32AA_ED78_0B93_41EC_1EBA409CA948.label = Area 60
album_A27E32AA_ED78_0B93_41EC_1EBA409CA948_0.label = Underground Utilities
album_C2397FE8_EB68_1939_41EC_459E60865F88.label = Area 30 Cake Receiving
album_C2397FE8_EB68_1939_41EC_459E60865F88_0.label = Area 30 Cake Receiving
album_C8E4D91D_F001_E98E_41E7_B9994C00CF2D.label = Area 50 Digester Control Bldg
album_C8E4D91D_F001_E98E_41E7_B9994C00CF2D_0.label = Area 50 - 211105 - Multivista - 211104 - WSSC Piscataway WRRF - Slideshows - Photo 33
album_C8E4D91D_F001_E98E_41E7_B9994C00CF2D_1.label = Area 50 -EA53D740-2538-4340-980A-29B4ADBA0F3C
album_DA5C6630_F003_7BC3_41D6_5DEF17E0B224.label = Area 10 211006 - Multivista - 211005 - WSSC Piscataway WRRF - Slideshows - Photo 30
album_DA5C6630_F003_7BC3_41D6_5DEF17E0B224_0.label = Area 10 211006 - Multivista - 211005 - WSSC Piscataway WRRF - Slideshows - Photo 30
album_DA5C6630_F003_7BC3_41D6_5DEF17E0B224_1.label = Area10 - 231B518A-63C6-4165-B2AF-DD38536069D8
map_C868AB4D_F001_698F_41D8_333FE7C8C180.label = MultivistaPhoto-2021-11-05 (1)
panorama_9463D27C_9E36_B3DA_41D1_35DBDB0738F2.label = PIC_20211018_151553
panorama_97C341D4_9E37_B12A_41E0_61226A522186.label = PIC_20211018_152150
panorama_97C34DB7_9E37_B156_41B1_FC2FC54077BC.label = PIC_20211018_152226
panorama_97C3561B_9E37_F35F_41D2_2C1A91DE2CE4.label = PIC_20211018_153138
panorama_97C3B6C5_9E37_732B_41E0_B1CB652070A8.label = PIC_20211018_151927
panorama_B30239E8_A2D7_197D_41CD_F264F17BFFE9.label = PIC_20211018_154936
panorama_B3024043_A2D7_06B2_41DA_DE7A90BF7DEC.label = PIC_20211018_155626
panorama_B302804B_A2C9_06B3_41D2_9DB89240EFA3.label = PIC_20211018_160731
panorama_B3028BF1_A2D7_196E_41B4_480D77285641.label = PIC_20211018_154224
panorama_B302D1EE_A2D7_0972_41D0_EC6CD44AD3F5.label = PIC_20211018_154107
panorama_B302DA14_A2C9_1AD5_41D1_C42F995EDF3D.label = PIC_20211018_160913
panorama_B302FDA6_A2C9_39F5_41E3_FC460CCEA2D2.label = PIC_20211018_161255
panorama_B3033646_A2D7_0AB5_41CB_29324A9CC2F1.label = PIC_20211018_160520
panorama_B303624A_A2D7_0ABD_41D4_11C985F2F680.label = PIC_20211018_160247
panorama_B3036DF5_A2D7_1956_41E0_0757418E3164.label = PIC_20211018_160017
panorama_B3038056_A2D7_0752_41E2_5C79C906D957.label = PIC_20211018_154816
panorama_B30393B2_A2D7_09ED_41C2_B03F61DF87CA.label = PIC_20211018_155850
panorama_B30396AA_A2D7_0BFD_41D2_FB71A727E0E8.label = PIC_20211018_155444
panorama_B3039817_A2D7_06D3_41DC_815869F79822.label = PIC_20211018_160120
panorama_B3039D2D_A2D7_3EF7_41D2_5A4B3EB97A08.label = PIC_20211018_155251
panorama_B303A394_A2D7_09D5_41C3_54638A0705D2.label = PIC_20211018_155151
panorama_B303BC31_A2D7_1EEE_41C5_159656159530.label = PIC_20211018_160351
panorama_B303E9ED_A2D7_7977_41DD_C9C953F36057.label = PIC_20211018_155730
panorama_B304EADA_A2C9_3B5D_41E4_3DF3C03800F0.label = PIC_20211018_163803
panorama_B304F4E0_A2C9_0F6D_41A5_CA9C943992F8.label = PIC_20211018_164045
panorama_B30500E6_A2C9_0775_41D2_86D0D087390F.label = PIC_20211018_163649
panorama_B30503A2_A2C9_09ED_41A9_0C5F958228E8.label = PIC_20211018_162430
panorama_B3050888_A2C9_07BD_41DA_1DBC272B6D73.label = PIC_20211018_162404
panorama_B30511BF_A2C9_09D2_4150_3980C80BEA42.label = PIC_20211018_161426
panorama_B30511F6_A2C9_0952_41C0_8C64D0490705.label = PIC_20211018_162037
panorama_B30515A9_A2C9_09FF_41C2_EB3A2F478C9E.label = PIC_20211018_161900
panorama_B3053700_A2C9_0AAD_41C0_41391EEEE7E6.label = PIC_20211018_163551
panorama_B3053B79_A2C9_795F_41BE_5844C1E07652.label = PIC_20211018_161638
panorama_B3053F83_A2C9_F9B3_41E1_0753E42861AF.label = PIC_20211018_163135
panorama_B305DD4E_A2C9_3EB5_41E1_4141DD43D6A4.label = PIC_20211018_162335
photo_268A7356_013D_D214_416A_AFCA7075F2A4.label = AREA30_Cake Receiving 1
photo_268A7356_013D_D214_416A_AFCA7075F2A4.label = AREA30_Cake Receiving 1
photo_2769F6D4_013D_D214_4170_39E251D8AB36.label = AREA30_Cake Receiving 2
photo_2769F6D4_013D_D214_4170_39E251D8AB36.label = AREA30_Cake Receiving 2
photo_2886A956_013D_FE69_4152_CA19B3A7287B.label = AREA60_Gas Conditioning 2
photo_2886A956_013D_FE69_4152_CA19B3A7287B.label = AREA60_Gas Conditioning 2
photo_2B9C3651_013D_F26A_4141_C309C4EAE317.label = AREA60_Gas Conditioning 1
photo_2B9C3651_013D_F26A_4141_C309C4EAE317.label = AREA60_Gas Conditioning 1
photo_3133DDFA_013E_D673_4149_CCFAAB3024E8.label = Area 30 658095851
photo_3133DDFA_013E_D673_4149_CCFAAB3024E8.label = Area 30 658095851
video_CB6EBBA3_C71A_2A67_41DE_189EDB4ABE5A.label = Cambi Installation-WSSC
video_CC75D6CD_C71A_3A23_41B7_9C5284CF5AF4.label = Solids Building-WSSC
video_E731E9E7_F132_B629_41EA_E501EF5D6D05.label = Dutchland Sidestream Install
## Hotspot
### Tooltip
HotspotMapOverlayArea_CD4A912F_F003_B98B_41D4_AF382FA9FC44.toolTip = AREA 10
HotspotPanoramaOverlayArea_A9B887F0_EA3A_B80D_41CC_EE1296DD22B7.toolTip = Tool Shed
HotspotPanoramaOverlayArea_D717CF36_EA37_4871_41A9_847E99A45298.toolTip = Construction Trailers